Sewerage & Local Authority Drains

In some cases, in order to supply a network of sewer and storm water drainage, local authorities traverse private land. This can place intended building restraints on landowners and are often referred to as easements. The presence and line of local authority drainage can only be established by viewing formal drainage plans.  In the case of the Brisbane City Council (other local authorities may have their own procedures), these can be obtained promptly from any Customer Service Centre for fee. Once these have been obtained, they should clearly show if there are any lines running through the block but other matters measures should also be taken by you.   

If additional building works are intended including new plumbing/drainage and the subject property is currently serviced with a ‘combined sewer drain’ shared by neighbours (very common up to the 1970s), then it is likely that the local authority as part of any building approval, will require disconnection from that drain with a fresh connection to the nearest council drain (‘jump up’).  

The local authority can also charge for the costs of accessing the manhole lid/grate to make the same accessible on the surface.  This would not normally be an issue for strata title or other such property owners.

Obtaining a copy of the plumbing and drainage plans for an address is a good idea and should be kept on file. This should show all the connections which the local authority has approved and this can be measured with all plumbing/drainage facilities currently at address.

qcs building services
Brisbane Pest Inspection